Once outside the VAB high-bay doors, the Moon rocket made a planned pause allowing the team to reposition the crew access arm on the mobile launcher before continuing to the launch pad. PDT) on November 3 as the crawler-transporter began the approximately 4-mile journey from the VAB to the launch pad. The Space Launch System rocket and Orion spacecraft for the Artemis I flight test are rolling to launch pad 39B at NASA’s Kennedy Space Center in Florida ahead of launch. Teams will continue working to configure SLS and Orion for the upcoming November 14 launch attempt. PDT) on November 4, the Space Launch System rocket and Orion spacecraft for the Artemis I mission arrived at launch pad 39B at NASA’s Kennedy Space Center in Florida after a nearly nine-hour journey from the Vehicle Assembly Building (VAB). space development effort a distinctly civilian orientation. NASA was established in 1958, succeeding the National Advisory Committee for Aeronautics (NACA), to give the U.S. Credit: (NASA/Joel Kowsky)Īround 8:30 a.m. The National Aeronautics and Space Administration (NASA / n æ s /) is an independent agency of the US federal government responsible for the civil space program, aeronautics research, and space research. We are currently housing 55 articles, and 69 files. Launch of the uncrewed flight test is targeted for November 14 at 12:07 a.m. seminal scientific instruments, and spectacular scenes in deep space, the Hayden Planetarium. NASA’s Artemis I mission is the first integrated test of the agency’s deep space exploration systems: the Orion spacecraft, SLS rocket, and supporting ground systems. NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen atop the mobile launcher as it arrives at Launch Pad 39B on Friday, November 4, 2022, at NASA’s Kennedy Space Center in Florida.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |